In order to expand and refresh our machinery fleet, in April Georock Srl will add the Casagrande C6xp2 tracked drilling rig and the Atlas Copco H23 compressor.
These machines will be used for micropiling, piling and special foundation structures.
NEWS: cantieri 2022 --> Realizzazione Ponte Sospeso e Skywalk nel Comune di Mezzocorona (TN)
News
NEWS: cantieri 2022 --> Mitigazione del rischio di caduta massi in sinistra idraulica del fiume San Leonardo nel Comune di Termini Imerese (PA)
News
IN EVIDENZA: lavori di consolidamento e riprofilatura parete rocciosa a monte della SS 237 in C.c. Comano Terme (TN)
Top Stories
TOP STORIES: Construction of the Nozza-Vestone Cyclepath
Between 2019 and 2020, our company was involved in the construction of the new Nozza-Vestone cyclepath in Lombardy.
Top Stories
TOP STORIES: Construction of the Lake Garda Cyclepath
Between 2016 and 2018, our company was involved in the construction of the Lake Garda cyclepath near Limone.
Top Stories
Request information
Georock s.r.l.
Borzago, 35A - 38088. Spiazzo, Trentino - Italy.
Tel. e Fax: +39 0465801135
E-Mail: info@georock.it
Pec: georock@pec.tn.it
VAT Number: 01284930227